This week-end involved a lot of cleaning up of loose renovation ends; at least as far as the kitchen and some downstairs bathroom go. I wired in the thermostat for the heated floor in the downstairs basement and installed the toilet, shower head, and faucet. The downstairs bath is basically done except for the shower walls and a couple towel bars
(
Read more... )