I'm pretty much down to the wire - not meaning to be punny. I have a few last finishing touches left to do, but for the most part, this room is done. I can move on to other things. So Project #9 is done. Here are a few pics of the done-ness.
Here is the Close-up of the Elvis Collection that's above the Daybed - I know it's odd, but I had to do something with the stuff:
I know I need to fix the album in the frame. It's on the list.
List of stuff left to do:
- Fix the Elvis Album
- Lamp for the Top of Sub-Woofer
- Fill in the Gaps on the crown with caulk
- Paint above the crown
- More Coats of paint on the crown
- Electrician - Plug for the lights, Switch for the lights, outside light for the door
- Mattress for the bed (on order)
- Leather Futon (to replace daybed when it moves upstairs)
- reupholster recliners
- New flooring
- Curtains for back door
- Curtains for the Open Doorway
- Shelves for Above the Sub-woofer (concession Stand)
- New Side Tables
I am pleased to say, that my garage is almost back to it's Pre - Media Room Project Status. The donation pile has gotten a little bigger and the bed frame has been moved out and utilized. It is a wide open space that I need to go and tidy up. You Know... Prepare it for the next round of projects!
The project list of 12 things has been whittled down to only 3 left to do. Front planting bed - Backyard cleanup - Office. Since the office will be a work in progress for a while... I will also start concentrating on cleaning out the Upstairs bedroom. It isn't on that big project list, but it will have to fill in for the outside projects... at least until Spring. It's been a catchall storage room for all the things I have not wanted to let go of ... And while I have a nice Donation Pile going, I only have 28 more days to build it up and get it out! You know... LET IT GOOOOOO!!!!!