stuff...

Feb 16, 2007 18:04

well the kitchen is on its way in. still need the electrician and plumber but hopefully they will be done this weekend. that means that just the builder needs to finish. really hope it gets done by next weekend. we've had no kitchen now pretty much since we moved into the house. we're working on 6 weeks of no kitchen sink to do washing up or counter space to prepare food for cooking. microwave meals for the lose!

the toilet keeps leaking out the back of it. we should hopefully be able to get that fixed over the next few weeks as well. it will be nice to not have to worry about holding the pipe at the back of the toilet in so the fresh water flushing through doesnt gush out all over the floor instead. at least it's not the dirty water coming out the bottom :P

and on that note, i'm off.
Previous post Next post
Up