The last time I was regularly posting pics I was still framing. That looks impressive but it moves very fast. The walls and sheetrock for the kitchen for example.. I did that yesterday. Took almost 4 hours.
A dedicated circuit for the fridge, stove and dishwasher.. plus outlets above the countertops.. another line for the range hood.. etc. That took a whole day.
The main bathroom has been 100% functional for months now. It's not entirely finished though. I did put down the tile floor and I built the shower enclosure and tiled that as well.. still have to paint it and build the closet. The kitchen will be in much the same state. Functional but I'll have a bit more to do making it pretty. I'll live with it!
Comments 8
Reply
Reply
(The comment has been removed)
( ... )
Reply
(The comment has been removed)
At this point it's all floors and paint and making it pretty. Not so bad really. My kitchen gets delivered on Sunday. That will be nice.
Reply
(The comment has been removed)
A dedicated circuit for the fridge, stove and dishwasher.. plus outlets above the countertops.. another line for the range hood.. etc. That took a whole day.
The main bathroom has been 100% functional for months now. It's not entirely finished though. I did put down the tile floor and I built the shower enclosure and tiled that as well.. still have to paint it and build the closet. The kitchen will be in much the same state. Functional but I'll have a bit more to do making it pretty. I'll live with it!
Reply
Leave a comment