More Workshop Pics

Mar 10, 2009 21:37





Finished setting the foundation blocks. This last one was the trickiest, since I had to square it to two others and also make sure it was the same height. It's pretty damn close.



With the blocks level, I could prepare the long joists that will support the floor. I'm using these joist hangers to support the short joists.



Finished preparing both of the long joists, and thus ended Day 2.

Next up is cutting the short joists to length, checking the whole thing for squareness, and adding the plywood floor. Since I have to go to class tomorrow I may not get a chance to do any work. Thursday and Friday will both be clear though (last I checked), so I'll have two more afternoons before the weather turns. At least now I can stack the lumber off the ground and cover it with tarps if need be.

woodworking, workshop project

Previous post Next post
Up