Workshop Update!

Mar 09, 2009 19:55





The first block set in the ground and leveled. This becomes the reference point for leveling the other 3 blocks of the foundation.



While digging a space for the second block, I encountered this massive root.



So I bought a hatchet. I am tempted to call her "Molly".



Now it is an ex-root.



The biggest bit of root, with destruction in the background.



And the second block is in and level.



At the end of my first day of work, I have three foundation blocks in the ground. They are all level with respect to one another.

Tomorrow the last block, and then I begin framing the floor!

woodworking, workshop project

Previous post Next post
Up