Now LIVEJOURNAL is playing up and the basin needs doing and I'm so sweaty ugh

Aug 09, 2015 18:06

I think ive said that my basin in the bathroom seems to have been fixed up by the pedestal and the mastic holding the tiles.
Its not possible to fix it with the proper screwholes because being ceramic and a thing of beauty the screws are squirrelled away with sod all access for a sodding drill or screwdriver. The thing needs offering, marking, removal, drilling and then with the screws sticking out the back so an angled screwdriver can go in the front fastened down a couple of turns left/right/left/right/left until the bastard is hard against the wall.
Oh and forget the pipes being there.....

So i thought i could improvise turnbuckles using jointing blocks well tough luck shitface theres not enough room for that EITHER.

Plan c involves fixing wooden moulding to the wall and then wooden moulding at right angles to that to hold the bleeder to the wall. It hopefully will allow the tiles to be reattached.

Ive left it too late to do it today. I was fine until i started to work when i started sweating so i couldnt see and i was dripping everywhere.

Bugger.

Another problem is that my knees are fucked and its agony being on them. Ah well.
Previous post Next post
Up