Jun 01, 2013 16:54
This past week they got the doors on and most of the trim done. The French door was a painful experience that required a planer and may atill require more work. Two of the incorrect doors were taken back and new ones delivered, but uninstalled. Stucco is done and we've been watering the house so it doesn't crack, which is an amusing undertaking. It's like we're watering the thing in the hopes that it will grow faster.
The painters are due out Monday to start masking and possibly painting. The cabinets are apparently over two weeks out despite ua being under the impression that they were sitting in a warehouse somewhere waiting to be installed.
The stucco came in about a thousand under bid, which is a nice change from everything else. Brawner ended up eating some of the overage on the drywall, especially after the framing fiasco and other things. We still don't know the cost on the windows. The guy hasn't come out to talk with us and claim his check. We're not paying until we get some answers about the mess.
Also new this week arw the garage doors. They look great. The workshop has two side-mount openers and the garage has a normal one. With the dormer windows we figured the wall mounts would look better.
We're still waiting to hear on the electric from the county. Usually the longer wait means it's passed. Let's hooe that is the case!