Preparing for Lighting

Mar 13, 2023 14:19

Yesterday, Lisa and I went to Lowe's to get some more surface conduit, which is part of her plan to mount the "studio lights" to the ceiling and attach them to a wall switch. That way, when we want to use the studio to record Railway Legends, Myths, and Stories, we can just flip the switch to light the set. Pictures later once the work is done.

I'm now very confident that we'll have a new episode out at the start of the month, and we should have enough time to record the May episode in good time as well.

house, rlms, lisa

Previous post Next post
Up