It's got legs!

Feb 03, 2009 14:45

Well, almost.

Got started a little late on the garage booth work due to dinner prep, but it went well. I welded the top end caps on the legs and cut them all to length. While they were being cut I marked the bottom plate centers for the needed adjustable foot hole. I was then getting cold and didn't want to switch to a new phase of the process that late. So it was inside to relax and watch some DIY before bed.

Tonight I hope to clean up the top plates so I can use the template to drill and install the rivet nuts for the hinges. Then on to the bottoms; drill the holes in the plates, weld the nuts for the adjustable feet, weld the plates to the bottom of the legs, and clean them up. That is assuming I can either do it with liquefied brains, or the drive home makes it better. I have a roast thawing for dinner, hopefully I can let that go while I'm out in the garage and have alyska listen for the alarm and come get me.

pkstudios, projects

Previous post Next post
Up