Last night was half shop work and half
KSW work again. I got the ground floor shop all cleared out and most things moved up to the second level, set up shelving on the second level and generally cleaned and organized. After that I made a huge mess tearing apart a water heater, whose tank will hopefully be the outer shell of my new forge. I took a bunch of pictures, but I’m working with a new (to me) camera and I didn’t catch that the previous users had cranked the exposure compensation up to +3 stops, so everything is super blown out. Once I get some time to try and fix them in Photoshop I’ll put them up and a longer post about the build out of the second floor and the forge project. The rest of the evening was spent draining
Pappy and showing a new
KSW plebe around and explaining how a steam engine works. Welcome to the fold… gooble gobble… one of us!