To-day I used my first vacation day of 2019 to do the following:
* pull weeds from Delbert's Garden (to compost bin)
* pulled weeds from Marvin's Garden
* pull a few weeds from the back yard (to compost bin)
* dig out blackberry on south side and put in compost bin
* cut and placed landscape fabric onto east driveway cap (EDC)
* empty all pebble bags (from the Heating Oil Tank bed) onto EDC
* pull pile of pebbles on south side by natural gas meter to EDC
* empty two full pebble bags (laying in Squeaker's Corner by heat exhaust) onto EDC
* added two roof tacks (found by meter) and a metal scrap (found by back steps) to metal can
* pulled weeds from House 70 border area
* transplanted red shamrock with rest of red shamrock.
Stopped for lunch and to escape the minor shower activity.

When I re-started:
* moved some brick stacks from Vancouver house to block gaps under back room.
* raked and weeded newly opened area of Squeaker's Corner
* cut weed tree branches, grape vines and blackberry branches in northeast corner.
* removed one wheelbarrow's worth of excess dirt from around the Chimney Memorial Walkway
* removed weeds and collected garbage on south side
* removed some weeds in back yard and on east driveway
* collapsed worktable and put in the shed area

To-morrow, more of the same. I should be able to complete removing the dirt and finish transferring brick stacks. Also do as much from this list as possible:
* move concrete posts to south side
* move Tiffany bricks to named brick repository
* more weeding and garbage collection on south side
* remove excess dirt by rain barrel #1
* continue to weed south driveway
* pull weeds in back yard, back walkway, patio.
* mow back lawn
* mow park strip
* weed LBT
* empty wheelbarrow and free it
* remove wood and put in wood pile
* weed area by bricks and weed tree
* move masonry in front walkway area and in tetherball court to LBT
* put on pickets to garbage area corner
* dig post hole, sink post, add rails, add pickets
* transplant evergreen tree
* trench circle and put in retaining wall correctly
* level heat exchanger and clean it
* level rain barrel #1

Friday, after the compost container is emptied, I will fill it with blackberry and other branches that I accumulated today.