Nice Fall day

Nov 07, 2024 18:40

It was a really nice day today: I did not even need a coat! So I did some outdoor stuff I felt important to do.

[x] swept the street and sidewalks of leaves and raked into an area around the Purple Catalpa.
[x] put out the garbage from inside the house and then brought the garbage bin to the curb.
[x] purchase nails and nail rails into back yard post(s), especially Edgar Allen Post.
[x] swept out the truck bed of compost dirt, most of it to a bucket for later use.
[x] swept the back driveway.
[x] swept the truck passenger side rug and put it back into the truck.
[x] put found nails and metal objects in bedroom into a can that was in the basement.
[x] provided USPS feedback for yesterday's purchase of tracking delivery for the mortgage payoff.
[x] purchase tools and silicon for caulking the bathtub
[x] purchase three cans of stain to try out for fir steps/platform. I have $354 left on my Intel Kudos card!

Friday and Sunday:

[ ] replace 7.5 amp fuse to fix instrument light issue.
[ ] pull Emily Post with a rope, then nail in rails.
[ ] drive to Vancouver to authorize final IRA transfer.
[ ] wash plastics, utensils, pots, and pans.
[ ] completely clean vanity/floor:consolidate boxes, move them away, remove cat urine, dust, vacuum.
[ ] move stuff to basement from laundry room.
[ ] discover which bulb needs replacing on left turn signal circuit for Ford Focus.
[ ] fix recycling bin tray under kitchen sink.
[ ] clean out bathroom sink drain.
[ ] clean bathtub all around, vacuum under vinyl, nail in surround
[ ] find sheet vinyl floor compatible with bathroom and kitchen: purchase.
[ ] buy metal t square, roller, vinyl adhesive, silicon, pvc strip, caulking, new corner strip.
[ ] find double-stick tape, putty knife, utility knife
[ ] patch vinyl floor in bathroom and secure floor.
[ ] add silicon and pvc strip.
[ ] add corner strip.
[ ] remove dirty caulking and put in new caulking.

- Saturday: Nov. 9
[ ] check USPS for delivery of payoff for House70 mortgage.
[ ] NWVRS meeting in Oregon City 15745 S Harley Ave to arrive at 7:30 a.m. (!). I am not hard-core enough to do this through Tri-Met: I would have to walk for 20 minutes to get to 15745 S Harley Ave. outside Oregon City. So I will need to drive to this. On the way back I can stop at the End of the Oregon Trail site on the left while driving back down Washington, then just a further south at the right the Hackett House, built 1890.

ford focus, kudos, fence, ira, mazda

Previous post Next post
Up