To do over the course of this week:
[ ] clean upstairs litter box
[ ] clean downstairs litter box
[ ] clean backroom litter box
To do next weekend or perhaps after work (I will work from home all week at least until can unload the truck of compost):
[ ] add silicon to fill the gap between the extension pipe and the joiner piece.
[ ] add remaining gray river rock (reserve any colored river rock)
[ ] add landscape fabric.
[ ] add gravel.
[ ] add landscape fabric.
[ ] add white pipe and cap, connect in the orthogonal pipe.
[ ] test.
[ ] cover with sock.
[ ] add landscape fabric.
[ ] add additional rock on the sides of the pipe.
[ ] final landscape fabric.
[ ] add clay to 1 foot below grade taking from the pile closest to the house.
At this point the river rock should be gone and so should the clay closest to the house.
[ ] dump the compost (if not before)
[ ] cut blackberry
[ ] remove branches. toss substandard pieces to compost. keep others for chipping (yes, when I get my chipper)
[ ] remove top soil from Byron Hill2 to be used for soil amendment.
[ ] fetch dirt from Burr Ave.
[ ] add top soil from Byron Hill 2, Burr Ave. house, with compost and clay.
soakage trench,
work