Nov 06, 2023 07:36
My responsibilities at this point:
* clean light fixtures.
* meet with Leda Krey today.
* help get Neil Kelly carpenter meet setup with Poest so he can complete the newel posts.
Wednesday is mostly sunny and 55. There won't be another sunny dry day until after Tuesday, Nov. 14. This might be a good day to do some of this, especially the waterproof filler:
* put waterproof filler around pipe holes in silt basin.
* Pull out river rock from excavated area.
* Fill in dirt:
-- slope down under the stoop.
-- further slope down between south inside corner and window well.
-- old drainage areas.
* dig five foot deep area for soakage trench.
* scribe soakage trench.
* line trench with landscape fabric.
* add 18 inches of river rock.
* add holey pipe with landscape fabric sleeve and/or re-use flexy pipe from old drainage area.
* connect trench input to silt basin output (dig trench for piping and add pipes and turns).
* once approved, cap soakage trench and fill in pipe trenches.
* put clamps on window well cover, remove plastic film.
* remove plastic film and tape from project windows.