1. First pass at the score - done. Pages of notes and discussions. Revised score being delivered.
2. Mixing this week and next.
3. Sundance deadline coming up next week. Will have a DVD with a minimum of missing shots and temp sound in them. We don't have the time to ADR before this, but it'll be ok and should hang together.
4. The plan is, after the big mix next week, to watch it and then do ABSOLUTELY NOTHING FOR AT LEAST TWO WEEKS.
See if I can do that.
Then, watch it again. Take notes. Figure out what needs to be tweaked, taken in, let out, etc. Keep working on the music license stuff.
Sundance is a crapshoot. But one way or another, we'll be premiering in 2009.