The machine, with its 4,608 servers, 9,216 central processing chips, and 27,648 graphics processors, weighs 340 tons. The system is housed in a 9,250 square-foot room at Oak Ridge National Laboratory’s facility in Tennessee. To keep this machine cool, 4,000 gallons of water are pumped through the system. The 13 megawatts of energy required to power this behemoth could light up over 8,000 US homes.
Comments 1
Reply
Leave a comment