Mission "Mount Everest" debrief

Apr 07, 2012 19:12

The mission Mount Everest was a success.

The mission log can be read here and here.

Important Notes:
- The CONSENT automated factory was destroyed. They will no longer be able to supply the Titans and Adventus with AI-controlled Mobile Suits.
- Rysis, Genya and the Nethereal Core all disappeared in their own directions. It's unknown where any of them are currently or what are they up to.
- Sending five super robots on a Gundam mission is a massive overkill.

Damages:
- Shin Getter suffered some minor damage and will be repaired over 3 days. Same with Epimetheus, except that he conveniently regenerates on his own.
- Cybuster's leg got busted. It will take 5 days to repair.
- Slava and G3-Saviour suffered medium structural and limb damage, and will be restored to full functionality in 7 days.
- Masaki used up a lot of prana and will have to rest for some time to regain it. Again.
- Lucchini used a lot of magic energy and should take it easy for a while, but she does that normally anyway.

route b, debrief, canon: aethereal wake, mission, canon: lost in the snow, canon: g-savior

Previous post Next post
Up