Today I plan on embroidering:
- A red V-neck sweater Arsed up, can't sell. I've gained a red sweater ¬_¬
- A black V-neck sweater
- A black cardigan Need to fix some bits by hand but I think it's ok
- A tea towel
How much I get done will depend on how long the designs take to stitch out.
I had sent James an email with photos of the pin-up scarf, skull/crown scarf and the bag I had done and I got a reply yesterday. He used the word "fantastic" ^__^ I think he'll like this next lot of stuff even more.
I shall update later with what I get done. It's 11.45am. I had better get the machine fired up!
Edit: Didn't get through as much as I hoped but I had a few problems and the design I did on the cardigan took just over 3 hours stitching time. Like I said to James, you don't get 100% perfection 100% of the time [sigh]