Jun 06, 2006 22:28
In case you're wondering whether you should read this, it's an update on my movie "Some Kind of Chill". If that means nothing to you, stop reading duder!
So first off, sorry for the long silence after that troubling update. It seemed like all hope was lost, but then I remembered I come from money, so the situation was easily remedied. The drive was sent off a few weeks ago along with a larger, unbroken drive. The data was switched onto the spiffy new drive, which arrived here about five days ago. I plugged it in, checked it out, and as if nothing ever happened, the movie was there just as I left it. Those data recovery people, man oh man. Anyway, as of today, I have returned to work on the movie, determining what is left to do and what is locked and ready. I can confidently say that the movie is about 70% ready. It will be a bit of a squeeze to get into picture lock by August, but I've got a decent amount of free time and a work ethic that is usually pretty reliable. The DVD will NOT be available at the time of release cuz thats gonna be a task in and of itself. But I can say it will surface eventually. And be spectacular. I've got some teaser trailers I'm looking to put on youtube, so keep an eye out for those. As for the premeire, there's still no definite date, just August. As always, when more info is figured out, it will be posted here. All I can say for now is get ready to have the whole world of the Huntington Chronicles flipped upside down, smashed in your face, rammed up your ass, and exploded in the sky in a bouquet of fireworks that can only be described as Some Kind Of Chill.
Hope to see you there.
-N. Fiore
Director of Photography, "Thursday"