i am sooo bad.
60 lacing rings (hey...20 for $1) 4 yards of linen rayon blend in navy blue 2 yards worsted wool, in navy blue now all i need is a cotton twill for interlining the bodice, and for the underskirt.= joanns gift card (the last of it, probably) and a 40% off coupon. and i will be getting more money on tuesday, so here's to hoping i have everything required. i'll worry about the gaurds at a later date. in most of the paintings they are black, but something tells me that's not getting past the costume check thing.
in other--though related--business....where the HELL is my smock and cap??? i put them all together, and i could swear it was in my faire box (too obvious, no?) ugh...i guess i need to get crackin on my room again, since i will be waiting for fabric and lacing rings to arrive.
bluh...my neck/head hurts. really gotta call membership services and gt a list of massage therapists. i've had this horrid headache for over a week now. and i think it might be connected to the muscle that i pulled over a week ago, which still bothers me, and occasionally elevated to hurts.
whateves. costuming and meteorology tomorrow. at least i can kinda sleep in. grommets will have to wait a while.