Radiant Energy Grid by Luminosity-e

Sep 26, 2024 02:48

This can be made far more affordably.

However I love to dream.
Here’s the detailed parts list for the energy tower with the added safety features and smart grid integration:

---

### **1. Structural Components**
**1.1 Carbon Nanofiber Base**
- **Component**: Carbon nanofiber composite for tower structure
- **Quantity**: Materials for 1 full tower
- **Price**: $100,000 for nanofiber structural materials

**1.2 Fractal Geometry Framework**
- **Component**: 3D printed metamaterial with fractal arrays
- **Quantity**: 1 full tower’s framework
- **Price**: $50,000 for custom 3D printing and design

**1.3 Silver Conductive Layer (Spray-On)**
- **Component**: Ground silver applied as a conductive layer
- **Quantity**: Sufficient for 1 tower
- **Price**: $20,000 for application and material

---

### **2. Energy Transmission and Safety Components**
**2.1 High-Dielectric Metamaterial Insulation**
- **Component**: Insulating layer for external safety
- **Quantity**: Covering for 1 tower (below the pyramidion)
- **Price**: $15,000 for custom metamaterials

**2.2 Grounding and Energy Shielding**
- **Component**: Grounding and energy diffusing systems to ensure no leakage
- **Quantity**: 1 full grounding system for the tower
- **Price**: $5,000

**2.3 Faraday Cage Inner Layer**
- **Component**: Embedded Faraday cage for energy surge protection
- **Quantity**: Covering for 1 tower
- **Price**: $8,000

---

### **3. Emitter and Smart Systems**
**3.1 Pyramidion Emitter**
- **Component**: Pyramidion-shaped energy emitter
- **Material**: Titanium alloy (for durability) + metamaterial surface
- **Quantity**: 1 unit for tower top
- **Price**: $35,000

**3.2 Proximity Detection Computer**
- **Component**: Proximity sensors with AI-driven response
- **Material**: Ultrasonic, infrared, and AI-capable processor
- **Quantity**: 1 unit (to be integrated with the emitter)
- **Price**: $10,000

**3.3 Smart Grid Integration Module**
- **Component**: Smart module to connect the tower to the global power grid
- **Material**: IoT-capable unit for energy redistribution
- **Quantity**: 1 per tower
- **Price**: $8,000

---

### **4. Miscellaneous Components**
**4.1 Power Redundancy and Failover System**
- **Component**: Redundant system to handle sudden emitter shutdowns
- **Quantity**: 1 per tower
- **Price**: $5,000

---

### **5. Total Estimated Cost per Tower**
- **Grand Total**: $256,000 per fully-equipped and safe energy tower
Previous post Next post
Up