update

Feb 29, 2008 06:19

I should have posted this yesterday, or the day before depending on how you count things. But I'm awake too early(bad dream) so here goes.

Progress has been made on the garage. I have the uprights for the first wall o shelves, and one shelve per set(currently three shelves total. they hold an amazing amount of stuff so they should make it much easier to clean the garage. Got the lockers moved to their new location and started to load the individual lockers with tools. Need toget drawer pulls for the doors though. The free cabinet from levelk up got moved to where the refridgerator was in the garage, and the wooden ammo cases are no longer in the doorway of the garage. Didn't much work done in the basement, so that area is still needing a lot of work. But the garage actually has room to stand, and as I pick up more shelf brackets and wood, the storage should get even better. I'm hoping to pick up some more tonight and finish off the top row on the WOS so I can use it for coolres and rubbermaid tubs. lower shelves will hold other stuff and the ground will hold the heavy stuff. what I really like about this shelving is that the bottom shelf does not have to be on the ground or near the ground. so I have have the bottom hold tools like the Table Saw and the O/A Rig. I also was able to(with Kathrynn's help) get the large AC unit off the floor and out of the way.

so no progress on any craft, but progress on getting space set up to work on stuff.

Next up is getting more shelving tonight and trying to clear a path through the front part of the garage. and then hopefully relocating the kiln to it's permanent home.

might get some of it done tonight, but depending on what goes on with tomorrow(DT Quals) I don't know how late I'll be able to work.

hopefully once it's more clear I can throw a party to celebrate.
Previous post Next post
Up