Typical

Aug 21, 2013 09:23

Our installers are supposed to be in and out of the warehouse by 9 or 9:30 with their supplies to do the jobs they're assigned to. One was supposed to be in around 8 while the other was to be in closer to 8:30. Thus far, the only person I've seen is Adam, who is pretty much passing through and getting some stuff together before rolling out for his estimate appointments today (and today is pretty full for him, from here to Lithonia, back into Atlanta, then north to Roswell and two Dunwoody appointments). I just checked in with Jodi and found out that poor Marvin is sick but Mike has no excuse.

And apparently they just got here to the warehouse so I have to call the client whenever they get loaded up and tell her they're running a little bit behind but should be there before she has to leave for class. Ugh, if this is just typical. It was dry at 8, if they'd shown up then they wouldn't have to wait for the rain to stop!

Seriously, my boys here need a swift kick sometimes. And I'm including Adam in that number.

Crossposted from DreamWidth. Click here to see other replies to this post.

general: life: misadventure, general: life: work: fence workshop

Previous post Next post
Up