My jet model plane is 90% done.
All thats left is to make one connection cable a bit longer, route some wires and tape shut the Impeller unit after I installed it into the fuselage.
Taping it seems to be a terrible way of attaching it, but the manufacturer did not supply a better way of doing that. Hmf.
I hope the maiden flight (maaaaaybe sunday, depending on the weather) works out. I'm scared.
Oh,
and flying the twin engine plane in the snow is wicked fun! (Short video only to see if it works... it did.)
http://www.youtube.com/watch?v=GCN5GOzkK0k