Transfer Complete.

Aug 04, 2008 13:33

A few years back, we're living in this apartment complex in Pasay which is near DLSU and Harrison Plaza. We lived here because my Uncle let us use the place since its near St. Paul Manila where my sis is studying at that time.

For some reason, we left the place and gone back to Tayuman where we first rented a apartment. This time we rented a a place which is loacated at the same building where my Mom works. Actually, the Office is located just in-front of LTO Tayuman and the rented place is at the 3rd floor.

Were done with the Transfer and I went there to help unpacking things. I was amazed at the size of the place. It has 3 bedrooms, 2 comfort rooms, a Large Dining area and a small Kitchen.

Although the place is old, my dad and mom tried to clean up the place, re-vanished the floors and repainted the walls. But there are still problems with the water line (There was a temporary water line which came from the office bit we had a hard time transfering from the Masters bathroom, where a PVC Pipe is connected to the Water supply at the office, to the other bathroom where we used as the main bathroom) and some holes in the ceiling. Not to mention the installation of the Telephone/Internet line and the Cable Line.

oh well... thats it for now, need to rest.... body aching.
Previous post Next post
Up