So, I've just been looking over my list of things I'm going to try and get done on working on the house this Spring and I threw together a list in descending order of priority. Anything indented is a later consideration that will require the preceding item to be completed before it can be done. This list is loosey goosey so if something needs to be bumped up in priority we'll do it as needed, but I'm trying to kind of space out the workload and avoid working in unsafe temperatures as much as possible. Also, if anyone spots anything that's missing from the list let me know and I'll add it.
SPRING 2011
- Build fence gate for yard (currently debating which side to build the gate on)
- Fix/plug gap in neighbor's fence in back right (looks like it's a gap between two fence posts)
- Get grass growing in backyard bald spots (Will hit this after re-levelling the ground for the fences going in the back)
- Split log pile and stack (the sooner it's split, the sooner it's seasoning)
- Re-level & cement fire pit stones
- Re-cut and solder plumbing in hall bathroom
- Spring cleaning cleanup
- Reattach toilet seat lid in hall bathroom (actually just needs tightening down)
- Clean out parents' basement (looking for books/sellable stuff)
- Clean out our basement & reorganize
- Move in filing cabinet downstairs
- Clean out guest bedroom
- Attach guest bedroom blinds
- Organize garage sale
- (Build basement folding table (if we want one))
- Build door hold for back door (so it doesn't swing with the wind when open)
SUMMER 2011
- Fix major erosion in back
- Replant backyard and front landscaping (esp. in far back where erosion is)
- Apply texture inserts for kitchen drawers
- Decide on/attatch cabinetry handles in kitchen
- Clean out garage
- Make/paint canvas for my room (wall art)
- Re-level dad's table saw
- Replace basement ceiling tiles
- Dismantle/relocate outside storage bin
- Remove/replace shelf wallpaper in hall closet
FALL 2011
- Re-attach workbench top
- Build new basement bookshelf/shelves
- Replace hallway/bathroom doors
- Remove bolts and patch hole in hall bathroom ceiling
- Finish installing attic insulation
- Make DVD shelf front facing blocks
- (Build firewood sale stand?)
- (Descale water heater)