Sep 25, 2009 08:46
Well The roof portion is completed, I've got the facing pieces all cut out and I have begun work on them. The way I've cut the facings is causing extra seams to be sewn up. I'm basically making a double layer so that I will be able to string a rope line from it to hang the walls on later. The outer layer can then also be cut into scallops.
So naturally, it's not going to make it to MGT. Which I don't mind, I'd rather have it be able to take walls later than not... I'll bring my non-period popup or nothing and just hang with others and move to the back row. Other than that I'm all packed for MGT. Got done at 2AM last night..
I need to remember to bring my camera and batteries. Those I have not packed!
pavilion,
mgt