We're finally able to see a little bit of light at the end of the tunnel, and we're pretty sure it's not a train coming back at us. We're in the stage now where everything is very exciting.
Our
last update for the October and November progress was quite recent, so you probably don't need a refresher.
And, if you're interested,
you can see all of my blog entries about the project, which started back in June.
The executive summary of the progress for these first 2 weeks of December is:
- Shower walls and tile
- Appliances "ready to go"
- Deck poles and flooring
- Cabinets
- Mud sink
- Countertops
- Wet bar
- Porch and deck railings
December 1, 2016 - Master shower walled in
December 1, 2016 - New kitchen sink, microwave, range, and dishwasher
waiting in the garage (amidst a good portion of the rest of our house
that's been "stored away" during this renovation and addition)
December 5, 2016 - New deck poled and flooring started
December 6, 2016 - Tiled-in master shower
December 9, 2016 - The first of the cabinets installation
December 15, 2016 - Deck and porch railings being installed
December 15, 2016 - Mud sink installed in laundry room
December 16, 2016 - Countertops on the "fridge side" of our new galley kitchen
December 16, 2016 - Countertops on the "range/microwave/sink/dishwasher side"
of our new galley kitchen
December 16, 2016 - Eight 4-ft. tall by 2-ft. wide by 1-ft. deep pantry cabinets
with adjustable shelves
December 16, 2016 - And we have a wet bar! (Well, it'll be wet after
the sink and faucet are installed. Bar fridge coming, too.)
December 16, 2016 - The rest of the railings on the (soon-to-be) screened-in porch
Coming soon: Back splashes, floors, appliances, and interior walls painting...