crm

/var/spool/messages on lowlevel_crrd_cfcc is echoed to this stream, reply *unsubscribe* to disable.

Jul 04, 2013 19:56

Startup sequence complete. flump inverter stable at eighty percent. Nominal power draw of one point seven eight gigawatts. Zero percent power draw. Central processing clusters report ready on power on self test. Unit 6f_d4 reports hard failure and has left the cluster negotiation. Modulated stateless processing coupler is active and has been assigned ff:ff:ff:ff:ff:ff:ff:ff. Fabric principle election is underway. Peacekeeper crrd0 is initiating low level hardware scan. All devices report standby power up logical off. Deadlock timer indicates internal reference point is collapse cycle 1385interrupt. Central processing clusters report principle election complete, 1022 of 1024 nodes responded to EFP. Elected principle is core_crrd_lab_0xb fcid is 160b07dd. Fabric is online found local operating system image at expected address 4a09:1571:38ce:9ced. CRRDOS is booting from logical unit number zero on bus zero of interface zero. Noop noop noop noop. Boot complete in single node sysplex additional nodes will load on BF frame retransmit. CRRD MGN 9 has power and precedence for startup. Executing stored process start in accordance with the prophecy. Woblexian interface core indicates logical power on request. Scope passed to reactor control. query device known ready state phase pattern - 0 pass. Query transformer coil adaptive rectifier status - 5 cold ok. Reactor control systems report green ok for woblexian cold power shunt on operation. Executing saturn modulation. Scope passed to CRRD fabric. All lower level systems report ok. All core operating systems are loaded. All expected nodes have joined central processing fabric. No new commands in input butter, there 12184391 until system final fail-safe/fail-active threshold is reached. Facility device and defence power on sequence is underway. Scope passed to reactor control. Woblexian reactor output indicates power levels at point nul exponent one five percent transformer coil is in warm shunt success state - 0 operational. Reactor control is disengaging flump inverter from draw mode. Reactor control has placed flump inverter into transfer mode. Interrupt. Scope is now CRRD fabric. Low-level reports that flump inverter has been detached. Power availability one point two eight petawatts and stable. Cycle stored processor requests central scheduler interrupt. Scope is now CRRD fabric. Knowen cycle endpoint exists, alert technicians. No external link found. Using nominative cellular uplink.
Previous post Next post
Up