Mission Control 2.0 progress report

Apr 06, 2007 00:47

I powered up the room today, it was a very lifting moment when I switched the breakers and the GFCI on and the panel lit up and worked just like it was supposed to.

Tomorrow will see the new 32-port patch panel being wired up (10 ports still need to be wired up, a total of 28 will be used) so I can move switches and Servers back downstairs. They have lived in the attic long enough.

I had forgotten my digicam in the office, so pics will have to wait until tomorrow... sorry!