(no subject)

Aug 14, 2006 16:31

reposted from email sent by my brother, Red River Army Depot:

Subject: Engineering Problem

A backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas USA at 65mph. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.

Problem: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no braking by the driver)

Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.



The correct answer - Who cares, the trucking company just bought themselves a bridge.








Previous post Next post
Up