 Yesterday, Johnnie finished up the lights.  I have running, brake and turn signals when I tow.  So at least I won't get pulled over for that.

WE still need to install the anti sway bar though as well as hook up the battery, figure out the rest of the 12 volt system and deal with the electrical.  Those are all pretty major things.  I also need to get tires for Ol' Blue.  He needs those before Savannah.

Now for what I got done.  I installed the fridge.  There is no plug, so that still has to be installed.  I just wanted to fill the hole up and get the fridge out of my garage.

Here is the before...                                                                         the middle


 

The after


I like it.  When the backsplash becomes stainless - chrome - aluminum... It will really pop.

I also got the baskets into the potty closet:
Before - just storing junk                                       middle - all cleaned out.                                     After - wire baskets from Master Bedroom Closet

  
  

That will be perfect for cans or other assorted things.  They won't roll around and I can see them too.

I also installed some LED wireless battery operated lights.  They have 3 lights and a remote.  $14.99 from the salvage store.  I put them all up and when I hit the remote BLAAAM!!!  The whole camper lights up.  Perfect.

I started cleaning the little things up.  I'm running out of time you see.  Tomorrow I'll install the spare tire carrier and then start loading the camper up.  I won't be able to get to the cushions.  But I have the Futon mattress and a memory foam eggshell thingee for the other bed.  should get us by till I can recover those cushions.  I need to get down to the Roswell Goodwill and the hobby lobby to check out their fabrics.  I'm looking for Blue preferably Navy and I'm looking for cheap. 