Furnace "E" Cast House

Mar 19, 2010 23:20

Went to the store today and picked up a pack of plastruct .06 sheet to finish off the 2nd cast house rebuild. (Except for scribbing). IT didn't take too long. Maybe an hour or so. I was able to match the dimensions heights and widths very closelt to the original rework, the overhang in the front is about a 1/16" off but not noticable.











Previous post Next post
Up